Maintenance facility for a magnetic tape subsystem
Abstract
Abstract A control unit for a magnetic tape subsystem of a data processing system includes a maintenance facility. This maintenance facility permits the exercise of the magnetic tape subsystem for diagnostic and maintenance purposes. The control unit is of the microprogram type, in which a control memory contains micro orders which control the operation of the magnetic tape units. The maintenance facility exercises the tape subsystem in two different manners-with the Input/Output command language of the CPU or with the micro order language of the control unit. This can be performed while the magnetic tape subsystem is switched offline to the CPU, or time-multiplexed with the operational usage of the magnetic tape subsyste by the CPU. The control unit includes a random access memory connected in parallel with the control memory. In the diagnostic mode, micro orders are transferred from a magnetic tape unit to the random access memory. Then, sequences of these micro orders are performed in the same way that micro orders stored in the control memory are otherwise executed in order to perform diagnostic testing. The data path transferring the micro orders from the magnetic tape unit to the random access memory is a simple one which bypasses the normal circuits which might otherwise introduce errors into the diagnostic micro orders. Amplitude sensors, which are otherwise used for error detection and correction, are connected to majority circuits which produce outputs when the amplitude sensors indicate that a majority of the data tracks are written with a ''''1.'''' In this manner, very reliable micro orders are obtained for performance of the diagnostic testing function. The maintenance facility provides full micro order control over a Field Engineer Buffer. Data and commands are loaded into a fetched from any buffer position under manual switch control or microprogram control.
Inventors
- 👤 A Carpentier
- 👤 J Meadows
- 👤 L Horsman
Bibliographic Details
Claims Analysis
Total Claims: 4References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1977-09-23 | 1978-03-25 | 1978-09-24 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1981-09-23 | 1982-03-25 | 1982-09-24 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1985-09-23 | 1986-03-25 | 1986-09-24 | $7700.00 | Window Closed / Lapsed |