Patent US4332207A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4332207A Expired / Lapsed US ⏱️ 0.0 years remaining

Method of improving load response on coal-fired boilers

Assignee: Alstom Power Inc
•
Filing: 1980-10-30
•
Granted: 1982-06-01
•
Expires: 2000-10-30
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method for rapidly changing the amount of pulverized coal supplied to a coal-fired furnace (10) equipped with a coal pulverizer (20) from a first steady-state level to a second steady-state level in response to a change in operating load demand. The amount of pulverized coal supplied to the furnace is instantaneously increased by providing pulverized coal to the furnace from a source (42) independent of the pulverizer or instantaneously decreased by diverting away from the furnace a portion of the pulverized coal being supplied by the pulverizer.

Inventors

  • 👤 Henry J. Blaskowski
  • 👤 David Palchik

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-23 16:13
CPC Classifications
F; F23; F23K; F23K3/00; F23K3/02; F23K1/00

Claims Analysis

Total Claims: 6
Claim 1
Independent Claim 260 words
A method of rapidly increasing the amount of pulverized coal supplied to a coal-fired furnace equipped with a coal pulverizer from a first steady-state level to a second steady-state level in response to an increase in the operating load demand of the furnace, comprising the steps of: a. causing a step increase in the rate of input of raw coal to the pulverizer from a first rate corresponding to a pulverizer output commensurate with said first steady-state level to a second rate corresponding to a pulverizer output commensurate with said second steady-state level; b. simultaneously with causing a step increase in the rate of input of raw coal to the pulverizer, establishing an additional supply of pulverized coal to the furnace from a source independent of the pulverizer, said additional supply of pulverized coal being initially established at an amount sufficient to cause a step increase in the amount of pulverized coal supplied to the furnace from said first steady-state level to said second steady-state level; c. as the pulverizer output gradually increases in response to the step increase in rate of input of raw coal to the pulverizer, controllably decreasing the amount of pulverized coal supplied to the furnace in said additional supply so that the total amount of pulverized coal supplied to the furnace by means of the pulverizer and said additional supply together remains constant at said second steady-state level; and d. simultaneously with the pulverizer output stabilizing at said second steady-state level, terminating said additional supply of pulverized coal to the furnace from said independent source.
Claim 2
Independent Claim 260 words
A method of rapidly increasing the amount of pulverized coal supplied to a coal-fired furnace equipped with a coal pulverizer from a first steady-state level to a second steady-state level in response to an increase in the operating load demand of the furnace, comprising the steps of: a. causing a step increase in the rate of input of raw coal to the pulverizer from a first rate corresponding to a pulverizer output commensurate with said first steady-state level to a second rate corresponding to a pulverizer output commensurate with said second steady-state level; b. simultaneously with causing a step increase in the rate of input of raw coal to the pulverizer, establishing an additional supply of pulverized coal to the furnace from a source independent of the pulverizer, said additional supply of pulverized coal being initially established at an amount sufficient to cause a step increase in the amount of pulverized coal supplied to the furnace from said first steady-state level to said second steady-state level; c. as the pulverizer output gradually increases in response to the step increase in rate of input of raw coal to the pulverizer, controllably decreasing the amount of pulverized coal supplied to the furnace in said additional supply so that the total amount of pulverized coal supplied to the furnace by means of the pulverizer and said additional supply together remains constant at said second steady-state level; and d. simultaneously with the pulverizer output stabilizing at said second steady-state level, terminating said additional supply of pulverized coal to the furnace from said independent source.
Claim 3
Dependent Claim 93 words
A method as recited in claim 1 wherein the step of establishing an additional supply of pulverized coal to the furnace from a source independent of the pulverizer comprises: a. providing a bin of stored pulverized coal; b. feeding pulverized coal from the bin into an air stream at a feed rate sufficient to cause a step increase in the amount of pulverized coal supplied to the furnace from said first steady-state level to said second steady-state level; and c. passing said air stream and the pulverized coal entrained therein to the furnace.
Claim 4
Independent Claim 259 words
A method of rapidly decreasing the amount of pulverized coal supplied to a coal-fired furnace equipped with a coal pulverizer from a first steady-state level to a second steady-state level in response to a decrease in the operating load demand of the furnace, comprising the steps of: a. causing a step decrease in the rate of input of raw coal to the pulverizer from a first rate corresponding to a pulverizer output commensurate with said first steady-state level to a second rate corresponding to a pulverizer output commensurate with said second steady-state level; b. simultaneously with causing a step decrease in the rate of input of raw coal to the pulverizer, diverting a portion of the pulverized coal being supplied from the pulverizer away from the furnace, said diverted portion of pulverized coal being initially established at an amount sufficient to cause a step decrease in the amount of pulverized coal supplied to the furnace from said first steady-state level to said second steady-state level; c. as the pulverizer output gradually decreases in response to the step decrease in rate of input of raw coal to the pulverizer, controllably decreasing the amount of pulverized coal diverted from the furnace so that the total amount of pulverized coal supplied to the furnace by means of the pulverizer and said additional supply together remains constant at said second steady-state level; and d. simultaneously with the pulverizer output stabilizing at said second steady-state level, terminating the diversion away from the furnace a portion of the pulverized coal being supplied from the pulverizer.
Claim 5
Independent Claim 259 words
A method of rapidly decreasing the amount of pulverized coal supplied to a coal-fired furnace equipped with a coal pulverizer from a first steady-state level to a second steady-state level in response to a decrease in the operating load demand of the furnace, comprising the steps of: a. causing a step decrease in the rate of input of raw coal to the pulverizer from a first rate corresponding to a pulverizer output commensurate with said first steady-state level to a second rate corresponding to a pulverizer output commensurate with said second steady-state level; b. simultaneously with causing a step decrease in the rate of input of raw coal to the pulverizer, diverting a portion of the pulverized coal being supplied from the pulverizer away from the furnace, said diverted portion of pulverized coal being initially established at an amount sufficient to cause a step decrease in the amount of pulverized coal supplied to the furnace from said first steady-state level to said second steady-state level; c. as the pulverizer output gradually decreases in response to the step decrease in rate of input of raw coal to the pulverizer, controllably decreasing the amount of pulverized coal diverted from the furnace so that the total amount of pulverized coal supplied to the furnace by means of the pulverizer and said additional supply together remains constant at said second steady-state level; and d. simultaneously with the pulverizer output stabilizing at said second steady-state level, terminating the diversion away from the furnace a portion of the pulverized coal being supplied from the pulverizer.
Claim 6
Dependent Claim 74 words
A method as recited in claim 3 wherein the step of diverting away from the furnace a portion of the pulverized coal being supplied to the furnace from the pulverizer comprises: diverting a portion of the pulverized coal leaving the pulverizer to a storage bin at a rate sufficient to cause a step decrease in the amount of pulverized coal supplied to the furnace from said first steady-state level to said second steady-state level.

References Cited (Backward Citations)

US2328498A Cited
US1562411A Cited
US1481067A Cited
US2141604A Cited
US3150962A Cited
US3467036A Cited
US4173189A Cited
US4263856A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1985-05-31 1985-11-30 1986-06-01 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1989-05-31 1989-11-30 1990-06-01 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1993-05-31 1993-11-30 1994-06-01 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag