US4590733A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Curtain wall panel and method
Assignee: National Gypsum Co
•
Filing: 1985-05-28
•
Granted: 1986-05-27
•
Expires: 2005-05-28
Abstract
Abstract A laminated curtain wall panel is prepared by continuously disposing foam boards onto adhesively coated gypsum sheathing followed by a third layer consisting of a reinforcing mesh and a cementitious binder, as the product progresses on a conveyor. The laminated product is erected by screws which are forced through the panel by a screw gun which disposes the screw head firmly against the gypsum sheathing.
Inventors
- 👤 Joseph W. Schneller
- 👤 Donald A. Kossuth
- 👤 J. Stephen Robinson
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-23 03:39
CPC Classifications
B; B28; B28B; B28B19/00; B28B19/0015; B28B19/003; B28B23/00; B28B23/0006; E; E04; E04B; E04B2/00; E04B2/88; E04B2/90; E04B2/92
Claims Analysis
Total Claims: 4
Claim 1
Independent Claim
148 words
The method of erecting a curtain wall of a building comprising the steps of disposing a pair of studs in spaced parallel relation and screw-attaching, to said spaced parallel studs, a prefabricated laminated panel, said panel comprising three layers, the first layer being a sheathing board, the second layer being a plastic foam insulation board and the third layer being a latex-modified Portland cement layer within which there is embedded a web of fiber glass mesh, said screw-attaching of said panels being by a powered screw gun having a special attachment for guiding the depth to which screws penetrate in attaching said panels driving said screws with said screw gun completely through the panel third layer and the panel insulation board to a depth such that the head of said screw engages said sheathing board, holding said sheathing board, and thus said panel, firmly to said parallel studs.
Claim 2
Independent Claim
148 words
The method of erecting a curtain wall of a building comprising the steps of disposing a pair of studs in spaced parallel relation and screw-attaching, to said spaced parallel studs, a prefabricated laminated panel, said panel comprising three layers, the first layer being a sheathing board, the second layer being a plastic foam insulation board and the third layer being a latex-modified Portland cement layer within which there is embedded a web of fiber glass mesh, said screw-attaching of said panels being by a powered screw gun having a special attachment for guiding the depth to which screws penetrate in attaching said panels driving said screws with said screw gun completely through the panel third layer and the panel insulation board to a depth such that the head of said screw engages said sheathing board, holding said sheathing board, and thus said panel, firmly to said parallel studs.
Claim 3
Dependent Claim
31 words
The method of erecting a curtain wall as defined in claim 1 wherein said panels are affixed to said studs before said studs are erected to support the finish curtain wall.
Claim 4
Dependent Claim
28 words
The method of erecting a curtain wall as defined in claim 1 wherein said studs are erected and affixed in place prior to screw attachment of said panels.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1989-05-26 | 1989-11-25 | 1990-05-27 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1993-05-26 | 1993-11-25 | 1994-05-27 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1997-05-26 | 1997-11-25 | 1998-05-27 | $7700.00 | Window Closed / Lapsed |