US4574604A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Process and apparatus for high speed fabrication of copper wire
Assignee: Essex Technology Inc
•
Filing: 1984-11-13
•
Granted: 1986-03-11
•
Expires: 2004-11-13
Abstract
Abstract A continuous process for high speed fabrication of wire comprises the steps of directing wire through a first set of drawing dies to reduce the wire diameter to an intermediate diameter, applying a lubricant to the wire during the drawing process, annealing the intermediate diameter wire while it is still coated with some of the lubricant, controlling the tensile forces and elongation of the wire during the anneal, and drawing the annealed intermediate diameter wire to a desired final diameter in a second set of dies. The process is partially well suited for fabricating fine copper wire having improved mechanical properties.
Inventors
- 👤 Ralph A. Vogel
- 👤 Keith E. Caudill
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-23 19:34
CPC Classifications
C; C22; C22F; C22F1/00; C22F1/08; B; B21; B21C; B21C1/00; B21C1/02; B21C1/04; B21C9/00; C21; C21D; C21D8/00; C21D8/06
Claims Analysis
Total Claims: 9
Claim 1
Independent Claim
217 words
A process for continuous high speed fabrication of wire, comprising the steps of: (a) passing a continuous length of wire at a constant speed through a first die set to reduce the wire diameter to form an intermediate diameter wire; (b) applying a lubricant to the wire while it passes through the first die set; (c) wrapping the lubricated intermediate diameter wire on a capstan which rotates at a speed which is faster than said constant speed of the wire to form a first wrap of wire; (d) passing the lubricated wire of the first wrap at said constant speed from the capstan through an annealer; (e) annealing the intermediate diameter wire in a non-oxidizing atmosphere within the annealer; (f) quenching the annealed intermediate diameter wire; (g) wrapping the quenched annealed intermediate diameter wire on said capstan to form a second wrap of wire, the number of turns in the first and second wraps selected to maintain low tensile forces on the wire within the annealer and to prevent significant elongation of the wire during said step of annealing, wherein said capstan pulls the wire through the annealer; and (h) passing the wire of the second wrap at said constant speed from the capstan through a second die set to form the wire to a final diameter.
Claim 2
Dependent Claim
217 words
A process for continuous high speed fabrication of wire, comprising the steps of: (a) passing a continuous length of wire at a constant speed through a first die set to reduce the wire diameter to form an intermediate diameter wire; (b) applying a lubricant to the wire while it passes through the first die set; (c) wrapping the lubricated intermediate diameter wire on a capstan which rotates at a speed which is faster than said constant speed of the wire to form a first wrap of wire; (d) passing the lubricated wire of the first wrap at said constant speed from the capstan through an annealer; (e) annealing the intermediate diameter wire in a non-oxidizing atmosphere within the annealer; (f) quenching the annealed intermediate diameter wire; (g) wrapping the quenched annealed intermediate diameter wire on said capstan to form a second wrap of wire, the number of turns in the first and second wraps selected to maintain low tensile forces on the wire within the annealer and to prevent significant elongation of the wire during said step of annealing, wherein said capstan pulls the wire through the annealer; and (h) passing the wire of the second wrap at said constant speed from the capstan through a second die set to form the wire to a final diameter.
Claim 3
Dependent Claim
24 words
The process of claim 1 wherein the tangential speed of said capstan is at least 2% greater than said constant speed of the wire.
Claim 4
Dependent Claim
81 words
The process of claim 1 wherein said annealing operation includes annealing the intermediate diameter wire in an induction heater and directing the intermediate diameter wire around rotating sheaves to form at least one loop which passes through the induction heater, the cool wire entering the annealer contacting the hot wire exiting the annealer of one of the sheaves to form a shorted secondary winding within the induction heater and to conductively transfer heat from the hot wire to the cool wire.
Claim 5
Dependent Claim
91 words
The process of claim 3 wherein said annealing operation includes annealing the intermediate diameter wire in an induction heater and directing the intermediate diameter wire around rotating sheaves to form two loops which pass through the induction heater, the beginning portion of the first loop contacting the ending portion of the second loop on one of the sheaves to form a two loop shorted secondary winding within the induction heater and to conductively transfer heat from the ending portion of the second loop to the beginning portion of the first loop.
Claim 6
Dependent Claim
29 words
The process of claim 3 wherein said annealing operation vaporizes the lubricant on the wire, the vaporized lubricant forming said non-oxidizing atmosphere around the wire during said annealing operation.
Claim 7
Dependent Claim
41 words
The process of claim 3 further comprising the step of controlling the amount of lubricant on the wire as it enters the annealer to a thin film which produces virtually no smoke when the wire is heated in said annealing operation.
Claim 8
Dependent Claim
12 words
The process of claim 1 further comprising annealing the final diameter wire.
Claim 9
Dependent Claim
42 words
Copper wire produced by the process of claim 7 wherein the wire has a final diameter less than 0.020 inches, an elastic ratio less then 75%, an ultimate tensile strength of at least 38 ksi and an elongation of at least 32%.
References Cited (Backward Citations)
US3181326A
Cited
US3605466A
Cited
US3842643A
Cited
US3826690A
Cited
US3962898A
Cited
US3952571A
Cited
US4112725A
Cited
US4326400A
Cited
US4280857A
Cited
US4365790A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1989-03-10 | 1989-09-09 | 1990-03-11 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1993-03-10 | 1993-09-09 | 1994-03-11 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1997-03-10 | 1997-09-09 | 1998-03-11 | $7700.00 | Window Closed / Lapsed |