A method of sealing leaky heat exchanger tubes in situ in nuclear installations, comprising the steps of: (a) providing a sleeve having an outer diameter slightly larger than the inner diameter of the tube whose leak is to be sealed and having a length shorter than the length of said tube yet sufficient to overlap said leak and having a flange at one end thereof, said flange being dimensioned larger than the inner diameter of said tube for limiting insertion of said sleeve into the tube; (b) cooling said sleeve to a temperature at which its outer diameter is sufficiently reduced to allow insertion of said sleeve into said tube; (c) inserting said cooled sleeve into said tube to be sealed through one end of the tube to overlap said leaky portion while said sleeve is so cooled until said insertion is limited by said flange; (d) allowing said sleeve to warm up to the temperature of said tube, (e) said sleeve being open at both ends such that fluids flowing through said heat exchanger tube flow through said sleeve also; and (f) guiding said sleeve into position for insertion by means of a guide fabricated of material which is solid at insertion temperatures but becomes fluid at room temperature, and allowing said guide to become fluid when the insertion of said sleeve is complete, whereby said sleeve forms with the inside of said tube in the region of said leak a leak-proof sealing bond with a generally uniform hoop stress thereby repairing said leak.
Claim 2
Independent Claim
255 words
A method of sealing leaky heat exchanger tubes in situ in nuclear installations, comprising the steps of: (a) providing a sleeve having an outer diameter slightly larger than the inner diameter of the tube whose leak is to be sealed and having a length shorter than the length of said tube yet sufficient to overlap said leak and having a flange at one end thereof, said flange being dimensioned larger than the inner diameter of said tube for limiting insertion of said sleeve into the tube; (b) cooling said sleeve to a temperature at which its outer diameter is sufficiently reduced to allow insertion of said sleeve into said tube; (c) inserting said cooled sleeve into said tube to be sealed through one end of the tube to overlap said leaky portion while said sleeve is so cooled until said insertion is limited by said flange; (d) allowing said sleeve to warm up to the temperature of said tube, (e) said sleeve being open at both ends such that fluids flowing through said heat exchanger tube flow through said sleeve also; and (f) guiding said sleeve into position for insertion by means of a guide fabricated of material which is solid at insertion temperatures but becomes fluid at room temperature, and allowing said guide to become fluid when the insertion of said sleeve is complete, whereby said sleeve forms with the inside of said tube in the region of said leak a leak-proof sealing bond with a generally uniform hoop stress thereby repairing said leak.
Claim 3
Independent Claim
191 words
A method plugging heat exchanger tubes in situ in nuclear installations, comprising the steps of: (a) providing a sleeve having an outer diameter slightly larger than the inner diameter of the tube to be plugged and having a length shorter than the length of the tube, said sleeve having is ends closed forming a chamber; (b) cooling said sleeve to a temperature at which its outer diameter is sufficiently reduced to allow insertion of said sleeve into said tube by temporarily introducing a cryogenic agent into said chamber; (c) inserting said cooled sleeve into said tube to be sealed through one end of the tube while said sleeve is so cooled; (d) removing said cryogenic agent from said chamber; (e) allowing said sleeve to warm up to the temperature of said tube, and (f) guiding said sleeve into position for insertion by means of a guide fabricated of material which is solid at insertion temperatures but becomes fluid at room temperature, and allowing said guide to become fluid when the insertion of said sleeve is complete, whereby said sleeve forms a plug preventing any fluid from entering the heat exchanger tube.
Claim 4
Independent Claim
191 words
A method plugging heat exchanger tubes in situ in nuclear installations, comprising the steps of: (a) providing a sleeve having an outer diameter slightly larger than the inner diameter of the tube to be plugged and having a length shorter than the length of the tube, said sleeve having is ends closed forming a chamber; (b) cooling said sleeve to a temperature at which its outer diameter is sufficiently reduced to allow insertion of said sleeve into said tube by temporarily introducing a cryogenic agent into said chamber; (c) inserting said cooled sleeve into said tube to be sealed through one end of the tube while said sleeve is so cooled; (d) removing said cryogenic agent from said chamber; (e) allowing said sleeve to warm up to the temperature of said tube, and (f) guiding said sleeve into position for insertion by means of a guide fabricated of material which is solid at insertion temperatures but becomes fluid at room temperature, and allowing said guide to become fluid when the insertion of said sleeve is complete, whereby said sleeve forms a plug preventing any fluid from entering the heat exchanger tube.
Claim 5
Independent Claim
190 words
A method of sealing leaky heat exchanger tubes in situ in nuclear installations, comprising the steps of: (a) providing a sleeve having an outer diameter slightly larger than the inner diameter of the tube whose leak is to be sealed and having a length shorter than the length of said tube yet sufficient to overlap said leak; (b) cooling said sleeve to a temperature at which its outer diameter is sufficiently reduced to allow insertion of said sleeve into said tube; (c) providing at one end of said sleeve a guide for insertion formed of a material which is solid when said sleeve is cooled but becomes fluid at higher temperatures; (d) inserting said cooled sleeve into said tube to be sealed through one end of the tube using said guide for proper positioning thereof while said sleeve is so cooled; and (e) allowing said sleeve to warm up to the temperature of said tube, whereby said guide becomes fluid and said sleeve forms with the inside of said tube in the region of said leak a leak-proof sealing bond with a generally uniform hoop stress thereby repairing said leak.
Claim 6
Independent Claim
190 words
A method of sealing leaky heat exchanger tubes in situ in nuclear installations, comprising the steps of: (a) providing a sleeve having an outer diameter slightly larger than the inner diameter of the tube whose leak is to be sealed and having a length shorter than the length of said tube yet sufficient to overlap said leak; (b) cooling said sleeve to a temperature at which its outer diameter is sufficiently reduced to allow insertion of said sleeve into said tube; (c) providing at one end of said sleeve a guide for insertion formed of a material which is solid when said sleeve is cooled but becomes fluid at higher temperatures; (d) inserting said cooled sleeve into said tube to be sealed through one end of the tube using said guide for proper positioning thereof while said sleeve is so cooled; and (e) allowing said sleeve to warm up to the temperature of said tube, whereby said guide becomes fluid and said sleeve forms with the inside of said tube in the region of said leak a leak-proof sealing bond with a generally uniform hoop stress thereby repairing said leak.
Claim 7
Dependent Claim
12 words
The method of claim 3, in which said sleeve is slightly tapered.
Claim 8
Dependent Claim
20 words
The method of claim 3, in which said insertion step is accomplished by rapidly propelling said sleeve into said tube.