← Back to Patent Explorer
US4325751A Expired / Lapsed US ⏱️ 0.0 years remaining

Method for producing a steel strip composed of a dual-phase steel

Assignee: SSAB AB
•
Filing: 1980-05-12
•
Granted: 1982-04-20
•
Expires: 2000-05-12
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A steel strip displaying high strength and formability properties is fabricated by coiling a steel strip which has been previously processed through a hot-strip mill from an initial steel having a very low amount of alloying compounds and having a temperature of between 750° and 900° C., the coiled steel strip being maintained at a temperature of between 800° and 650° C. for a period of at least one minute, and thereafter cooled to a temperature of below 450° C., the cooling being accomplished at a rate exceeding 10° C./second.

Inventors

  • 👤 Erik A. A. Josefsson

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-23 10:34
CPC Classifications
C; C21; C21D; C21D8/00; C21D8/02; C21D8/0221; C21D8/0226; C21D2211/00; C21D2211/005; C21D2211/008; C21D8/0247; C21D8/0263

Claims Analysis

Total Claims: 7
Claim 1
Independent Claim 163 words
A method of forming a steel strip which displays high strength and formability properties, the steel in said steel strip comprising a dual-phase steel containing mostly fine-grained ferrite with grains of martensite dispersed therein, which method comprises (a) processing an initial steel which comprises 0.05-0.20% carbon, 0.50-2.0% silicon, 0.50-1.5% manganese, 0-1.5% chromium, 0-0.15% vanadium, 0-0.15% molybdenum, 0-0.04% titanium, 0-0.02% niobium, balance of iron and normal impurities through a hot-strip mill so as to form a hot steel strip, (b) cooling the hot steel strip of step (a) to a temperature of between 800° and 650° C., (c) coiling the steel strip of step (b), (d) maintaining the temperature of the coiled steel strip of step (c) within the range of 800° and 650° C. for a time period of more than one minute, (e) uncoiling the steel strip of step (d), and (f) cooling the steel strip from step (e) to a temperature of below 450° C. at a rate exceeding 10° C./second.
Claim 2
Independent Claim 163 words
A method of forming a steel strip which displays high strength and formability properties, the steel in said steel strip comprising a dual-phase steel containing mostly fine-grained ferrite with grains of martensite dispersed therein, which method comprises (a) processing an initial steel which comprises 0.05-0.20% carbon, 0.50-2.0% silicon, 0.50-1.5% manganese, 0-1.5% chromium, 0-0.15% vanadium, 0-0.15% molybdenum, 0-0.04% titanium, 0-0.02% niobium, balance of iron and normal impurities through a hot-strip mill so as to form a hot steel strip, (b) cooling the hot steel strip of step (a) to a temperature of between 800° and 650° C., (c) coiling the steel strip of step (b), (d) maintaining the temperature of the coiled steel strip of step (c) within the range of 800° and 650° C. for a time period of more than one minute, (e) uncoiling the steel strip of step (d), and (f) cooling the steel strip from step (e) to a temperature of below 450° C. at a rate exceeding 10° C./second.
Claim 3
Dependent Claim 25 words
A method according to claim 1 wherein the hot steel strip is cooled in step (b) to a temperature of between 750° and 650° C.
Claim 4
Dependent Claim 29 words
A method according to claim 1 wherein the steel strip coming out of the hot-strip mill in step (a) has a temperature of between 750° C. and 900° C.
Claim 5
Dependent Claim 52 words
A method according to claim 1 wherein the temperature of the steel strip in step (b) is maintained at a temperature of between 800° and 650° C. for a time period sufficient to cause at least 80% of the ferrite in the steel which would normally form during slow cooling to precipitate.
Claim 6
Dependent Claim 43 words
A method according to claim 1 wherein the cooling in step (f) is accomplished at a sufficient rate that at most 5% of the amount of austenite remaining in the steel of the coiled steel strip after step (e) is transformed into pearlite.
Claim 7
Dependent Claim 43 words
A method according to claim 1 wherein the cooling in step (b) is accomplished while the steel strip passes through a first cooling device, and wherein the cooling in step (f) is accomplished while the steel strip passes through a second cooling device.

References Cited (Backward Citations)

SU197709A1 Cited
US4008103A Cited
US4129461A Cited
US4072543A Cited
US4184898A Cited
JPS54100920A Cited
JPS54114426A Cited
US4159218A Cited
US4196025A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1985-04-19 1985-10-19 1986-04-20 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1989-04-19 1989-10-19 1990-04-20 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1993-04-19 1993-10-19 1994-04-20 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag