Abstract A method of bonding a diamond or cubic boron nitride abrasive compact to a second such compact in which a braze alloy layer is deposited on a layer of a transition metal on the first compact, the second compact being then placed on the braze layer and the whole assembly being heated to effect bonding between the first and second compacts.
Inventors
- 👤 Rainer Dietrich
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-23 17:43
CPC Classifications
C; C22; C22C; C22C26/00; B; B22; B22F; B22F7/00; B22F7/06; B22F7/062; B22F7/064; B24; B24D; B24D18/00
Claims Analysis
Total Claims: 18
Claim 1
Independent Claim
161 words
A method of bonding a diamond or cubic boron nitride abrasive compact to a second such compact or to a cemented carbide support including the steps of depositing a layer of a transition metal on the first compact in unbonded condition, depositing a layer of a braze alloy on the transition layer in unbonded condition, the braze alloy having a melting point in the range 650° C. to 750° C. and being capable of alloying with the transition metal, then, with the two layers unbonded to each other and the first compact, placing the second compact or carbide support on the braze layer; and heating the thus-formed unbonded assembly at a temperature between 650° C. and 750° C. for a period of 2 to 180 minutes with the first and second compacts clamped together at a pressure of between 72.5 and 1450 lbs/sq. inch to produce an alloy bonding layer bonding the first compact to the second compact or carbide support.
Claim 2
Independent Claim
161 words
A method of bonding a diamond or cubic boron nitride abrasive compact to a second such compact or to a cemented carbide support including the steps of depositing a layer of a transition metal on the first compact in unbonded condition, depositing a layer of a braze alloy on the transition layer in unbonded condition, the braze alloy having a melting point in the range 650° C. to 750° C. and being capable of alloying with the transition metal, then, with the two layers unbonded to each other and the first compact, placing the second compact or carbide support on the braze layer; and heating the thus-formed unbonded assembly at a temperature between 650° C. and 750° C. for a period of 2 to 180 minutes with the first and second compacts clamped together at a pressure of between 72.5 and 1450 lbs/sq. inch to produce an alloy bonding layer bonding the first compact to the second compact or carbide support.
Claim 3
Dependent Claim
15 words
A method according to claim 1 wherein the transition metal is provided in powdered form.
Claim 4
Dependent Claim
21 words
A method according to claim 2 wherein the transition metal layer has a thickness in the range 10 to 100 microns.
Claim 5
Dependent Claim
22 words
A method according to claim 3 wherein the layer of braze alloy has a thickness in the range 0.05 to 0.5 mm.
Claim 6
Dependent Claim
12 words
A method according to claim 1 wherein the transition metal is titanium.
Claim 7
Dependent Claim
22 words
A method according to claim 1 wherein the layer of braze alloy has a thickness in the range 0.05 to 0.5 mm.
Claim 8
Dependent Claim
22 words
A method according to claim 1 wherein the layer of braze alloy has a thickness in the range 0.1 to 0.2 mm.
Claim 9
Dependent Claim
22 words
A method according to claim 1 wherein the alloy consists predominantly of one or more of the metals gold, copper and silver.
Claim 10
Dependent Claim
17 words
A method according to claim 8 wherein the alloy contains a minor amount of zinc or cadmium.
Claim 11
Dependent Claim
14 words
A method according to claim 1 wherein the first compact is a diamond compact.
Claim 12
Dependent Claim
28 words
A method according to claim 1 wherein the temperature is raised to the required value to effect bonding at a rate of 20 to 500° C. per minute.
Claim 13
Dependent Claim
15 words
A method according to claim 1 wherein the heating is effected in a non-oxidising atmosphere.
Claim 14
Dependent Claim
25 words
A method according to claim 12 wherein the non-oxidising atmosphere is provided by an inert gas or a vacuum of 10 -4 Torr or better.
Claim 15
Independent Claim
175 words
A method of bonding a diamond compact to a cemented carbide support including the steps of depositing a powdered transition metal layer of thickness 10 to 100 microns on the first compact in unbonded condition, depositing a layer of thickness 0.05 to 0.5 mm of a braze alloy on the transition layer in unbonded condition, the braze alloy consisting predominantly of one or more of the metals gold, silver and copper, having a melting point in the range 650° C. to 750° C. and being capable of alloying with the transition metal, then, with the to layers unbonded to each other and the first compact, placing the carbide support on the braze layer; and heating the thus-formed unbonded assembly to a temperature of 650° C. to 750° C. and maintaining the elevated temperature, once reached, for a period of 2 to 180 minutes with the first and second compacts clamped together at a pressure of between 72.5 and 1450 lbs/sq. inch to produce an alloy bonding layer bonding the first compact to the carbide support.
Claim 16
Independent Claim
175 words
A method of bonding a diamond compact to a cemented carbide support including the steps of depositing a powdered transition metal layer of thickness 10 to 100 microns on the first compact in unbonded condition, depositing a layer of thickness 0.05 to 0.5 mm of a braze alloy on the transition layer in unbonded condition, the braze alloy consisting predominantly of one or more of the metals gold, silver and copper, having a melting point in the range 650° C. to 750° C. and being capable of alloying with the transition metal, then, with the to layers unbonded to each other and the first compact, placing the carbide support on the braze layer; and heating the thus-formed unbonded assembly to a temperature of 650° C. to 750° C. and maintaining the elevated temperature, once reached, for a period of 2 to 180 minutes with the first and second compacts clamped together at a pressure of between 72.5 and 1450 lbs/sq. inch to produce an alloy bonding layer bonding the first compact to the carbide support.
Claim 17
Dependent Claim
12 words
A method according to claim 14 wherein the transition metal is titanium.
Claim 18
Dependent Claim
28 words
A method according to claim 15 wherein the temperature is raised to the required value to effect bonding at a rate of 20° to 500° C. per minute.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1983-10-21 | 1984-04-21 | 1984-10-21 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1987-10-21 | 1988-04-21 | 1988-10-21 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1991-10-21 | 1992-04-21 | 1992-10-21 | $7700.00 | Window Closed / Lapsed |