Claims Analysis
Total Claims: 29
Claim 1
Independent Claim
181 words
A subsea structure comprising: interconnected vertical and horizontal structural tubes to form a box-like framework support for subsea oil and/or gas drilling and production equipment; certain of said horizontal tubes forming peripheral rings on said framework; said vertical and horizontal tubes being segregated to form compartmented ballast chambers capable of being flooded and dewatered; said tubes of said uppermost ring being larger than said other tubes and having at least a part thereof extending outwardly of said other tubes to provide a fender to protect said drilling and production equipment; at least two of said vertical structural tubes forming pile sleeves; guide means on said structural tubes for guiding equipment into said pile sleeves for installing piles to anchor said subsea structure on the sea floor and for releasing said subsea structure from the sea floor; said tubes providing both floating and submerged stability; and beacons and/or other means of telemetry mounted on said tubular members for communicating with a surface drilling vessel to determine and provide information to the surface concerning tilt of said subsea structure and the azimuth thereof.
Claim 2
Dependent Claim
181 words
A subsea structure comprising: interconnected vertical and horizontal structural tubes to form a box-like framework support for subsea oil and/or gas drilling and production equipment; certain of said horizontal tubes forming peripheral rings on said framework; said vertical and horizontal tubes being segregated to form compartmented ballast chambers capable of being flooded and dewatered; said tubes of said uppermost ring being larger than said other tubes and having at least a part thereof extending outwardly of said other tubes to provide a fender to protect said drilling and production equipment; at least two of said vertical structural tubes forming pile sleeves; guide means on said structural tubes for guiding equipment into said pile sleeves for installing piles to anchor said subsea structure on the sea floor and for releasing said subsea structure from the sea floor; said tubes providing both floating and submerged stability; and beacons and/or other means of telemetry mounted on said tubular members for communicating with a surface drilling vessel to determine and provide information to the surface concerning tilt of said subsea structure and the azimuth thereof.
Claim 3
Dependent Claim
37 words
A structure as recited in claim 1 including orienting means arranged on said structure through which lines are extendible to a surface drilling vessel above said subsea structure and surface working vessels outboard of said drilling vessel.
Claim 4
Dependent Claim
25 words
A structure as recited in claim 2 wherein said subsea structure is generally rectangular, said orienting means comprising two means, each diagonally opposite the other.
Claim 5
Dependent Claim
44 words
A structure as recited in claim 3 wherein said drilling and production equipment includes electrohydraulic units, framework for flowline connectors, flowline valves, separator and pump unit, production manifolding, well bays, an antipollution pan, buoyancy control manifolds, compressors, power generators, and other oil/gas production apparatus.
Claim 6
Independent Claim
85 words
A method for maneuvering large subsea structures comprising the steps of: arranging said structure to float in water adjacent a drilling vessel; connecting lines between said vessel and said structure; keelhauling said structure to beneath said vessel; ballasting said structure to level it in the water; lowering said structure to the sea floor; geographically orienting said structure prior to placement on the sea floor; sinking piles through said structure to anchor it to the sea floor; cementing said piles in place; and leveling said structure.
Claim 7
Independent Claim
85 words
A method for maneuvering large subsea structures comprising the steps of: arranging said structure to float in water adjacent a drilling vessel; connecting lines between said vessel and said structure; keelhauling said structure to beneath said vessel; ballasting said structure to level it in the water; lowering said structure to the sea floor; geographically orienting said structure prior to placement on the sea floor; sinking piles through said structure to anchor it to the sea floor; cementing said piles in place; and leveling said structure.
Claim 8
Dependent Claim
25 words
A method as recited in claim 5 including said steps of: severing said piles; deballasting said structure; and floating said structure to the water's surface.
Claim 9
Dependent Claim
145 words
A subsea structure comprising: a plurality of horizontal and vertical structural tubes arranged to provide support for subsea oil and/or gas drilling and production equipment; certain of said tubes being segregated to form compartmented ballast chambers capable of being selectively flooded or dewatered to achieve desired negative or positive buoyancies for said structure; certain other of said structural tubes forming pile sleeves; said horizontal tubes forming peripheral circumferential ring members as well as interstitial supports; and the uppermost of said ring members being larger than said other ring members to provide a large water plane area for floating stability and to provide, also, a high center of buoyancy for submerged stability; at least a part of said uppermost ring member extending outwardly of said other ring members to provide a fender to protect equipment surrounded by said uppermost ring member from damage by submerged objects.
Claim 10
Dependent Claim
145 words
A subsea structure comprising: a plurality of horizontal and vertical structural tubes arranged to provide support for subsea oil and/or gas drilling and production equipment; certain of said tubes being segregated to form compartmented ballast chambers capable of being selectively flooded or dewatered to achieve desired negative or positive buoyancies for said structure; certain other of said structural tubes forming pile sleeves; said horizontal tubes forming peripheral circumferential ring members as well as interstitial supports; and the uppermost of said ring members being larger than said other ring members to provide a large water plane area for floating stability and to provide, also, a high center of buoyancy for submerged stability; at least a part of said uppermost ring member extending outwardly of said other ring members to provide a fender to protect equipment surrounded by said uppermost ring member from damage by submerged objects.
Claim 11
Dependent Claim
43 words
A structure as recited in claim 7 including guide means on said structural tubes for guiding equipment into said piling sleeves for installing piles to anchor said subsea structure on the sea floor and for releasing said subsea structure from the sea floor.
Claim 12
Dependent Claim
39 words
A structue as recited in claim 8 including telemetry means mounted on said tubular members for communicating with the water surface to determine and provide information to the surface concerning tilt of said subsea structure and the azimuth thereof.
Claim 13
Dependent Claim
25 words
A structure as recited in claim 9 including orienting means arranged on said structure; and orienting lines extending through said orienting means to the surface.
Claim 14
Dependent Claim
27 words
A structure as recited in claim 10 wherein said subsea structure is generally rectangular and said orienting means comprises two such means each diagonally opposite the other.
Claim 15
Dependent Claim
40 words
A structure as recited in claim 11 wherein said drilling and production equipment includes electrohydraulic units, framework for flowline connectors, flowline valves, separator and pump unit, production manifolding, well bays, an antipollution pan, buoyancy control manifolds, compressors, and power generators.
Claim 16
Independent Claim
61 words
A method for maneuvering large subsea structures comprising the steps of: arranging said structure to float in water adjacent a drilling vessel; ballasting said structure to trim said structure level at the water surface; ballasting said structure to a negative buoyancy; keelhauling said structure to beneath said drilling vessel; lowering said structure to the sea floor; and orienting said structure geographically.
Claim 17
Independent Claim
61 words
A method for maneuvering large subsea structures comprising the steps of: arranging said structure to float in water adjacent a drilling vessel; ballasting said structure to trim said structure level at the water surface; ballasting said structure to a negative buoyancy; keelhauling said structure to beneath said drilling vessel; lowering said structure to the sea floor; and orienting said structure geographically.
Claim 18
Dependent Claim
24 words
A method a recited in claim 13 including pile founding said structure onto the sea floor; and cementing said piles in the sea floor.
Claim 19
Dependent Claim
11 words
A method as recited in claim 14 including leveling said structure.
Claim 20
Dependent Claim
22 words
A method as recited in claim 15 including: severing said piles; deballasting said structure; and floating said structure to the water surface.
Claim 21
Independent Claim
338 words
A method for maneuvering a large subsea structure comprising the steps of: arranging said structure to float in water adjacent a drilling vessel; connecting lines between said vessel and said structure; keelhauling said structure to beneath said vessel; ballasting said structure to level it in the water; lowering said structure to the sea floor; geographically orienting said structure prior to placement of it on the sea floor; sinking piles through said structure to anchor it to the sea floor; cementing said piles in place; leveling said structure; said structure including cylindrical pile sleeves located at peripheral points on said structure through which said piles are sunk; the steps of cementing said piles in place and leveling said structure including: lowering a drill string containing a drill bit through the lowest one of said pile sleeves and drilling a pile hole to a desired depth; removing said drill string and drill bit to said vessel; lowering a first pipe containing slips into said pile hole through said pile sleeve and engaging said slips with the inner wall of said pile sleeve to permit upward movement of said pile sleeve but not downward movement thereof relative to said first pipe; pumping cement down said first pipe and up the annulus of said pile hole surrounding said first pipe until said cement is just below the bottom of said pile sleeve; removing the upper portion of said first pipe above said slips to said vessel; lowering a second pipe containing a lifting tool into said pile sleeve and engaging the lifting tool with said pile sleeve; pulling up on said second pipe to raise said pile sleeve and thereby said structure until said structure is as near level as can be achieved; removing said lifting tool and said second pipe; repeating the above cementing and leveling operations on each of said other pile sleeves until said structure is level; and pumping cement through the second pipe into the top of each of said pile sleeves until cement fills said pile sleeves.
Claim 22
Independent Claim
338 words
A method for maneuvering a large subsea structure comprising the steps of: arranging said structure to float in water adjacent a drilling vessel; connecting lines between said vessel and said structure; keelhauling said structure to beneath said vessel; ballasting said structure to level it in the water; lowering said structure to the sea floor; geographically orienting said structure prior to placement of it on the sea floor; sinking piles through said structure to anchor it to the sea floor; cementing said piles in place; leveling said structure; said structure including cylindrical pile sleeves located at peripheral points on said structure through which said piles are sunk; the steps of cementing said piles in place and leveling said structure including: lowering a drill string containing a drill bit through the lowest one of said pile sleeves and drilling a pile hole to a desired depth; removing said drill string and drill bit to said vessel; lowering a first pipe containing slips into said pile hole through said pile sleeve and engaging said slips with the inner wall of said pile sleeve to permit upward movement of said pile sleeve but not downward movement thereof relative to said first pipe; pumping cement down said first pipe and up the annulus of said pile hole surrounding said first pipe until said cement is just below the bottom of said pile sleeve; removing the upper portion of said first pipe above said slips to said vessel; lowering a second pipe containing a lifting tool into said pile sleeve and engaging the lifting tool with said pile sleeve; pulling up on said second pipe to raise said pile sleeve and thereby said structure until said structure is as near level as can be achieved; removing said lifting tool and said second pipe; repeating the above cementing and leveling operations on each of said other pile sleeves until said structure is level; and pumping cement through the second pipe into the top of each of said pile sleeves until cement fills said pile sleeves.
Claim 23
Dependent Claim
77 words
A method as recited in claim 17 including: conditioning said pile hole by displacing seawater with viscous drilling fluid to preserve said pile hole prior to the step of removing said drill string and drill bit to said vessel; and running a logging tool through said first pipe to detect cement as it moves uphole in the first pipe-pile hole annulus, said cement containing radioactive material sufficient to provide a reading on a radioacitve detector logging tool.
Claim 24
Dependent Claim
38 words
A method as recited in claim 17 including the steps of: drilling out cement in each of said pile sleeves; cutting off each of said pile sleeves; deballasting said structure; and floating said structure to the water surface.
Claim 25
Dependent Claim
93 words
A method as recited in claim 19 in which said structure is rectangular and said pile sleeves are positioned at each corner of said rectangle and including the steps of: drilling out cement in two of the diagonally positioned pile sleeves and then cutting off those pile sleeves; initiating deballasting of said structure; drilling out cement in the remaining two pile sleeves; locating explosive compounds at the point of severance of said other two pile sleeves and then explosively severing said other two pile sleeves; and floating said structure to the water's surface.
Claim 26
Dependent Claim
261 words
A method as recited in claim 15 in which said structure includes cylindrical pile sleeves located at peripheral points on said structure through which said piles are sunk and the steps of cementing said piles in place and leveling said structure include: lowering a drill string containing a drill bit through the lowest one of said pile sleeves and drilling a pile hole to a desired depth; removing said drill string and drill bit to said vessel; lowering a first pipe containing slips into said pile hole through said pile sleeve and engaging said slips with the inner wall of said pile sleeve to permit upward movement of said pile sleeve but not downward movement thereof relative to said first pipe; pumping cement down said first pipe and up the annulus of said pile hole surrounding said first pipe until said cement is just below the bottom of said pile sleeve; removing the upper portion of said first pipe above said slips to said vessel; lowering a second pipe containing a lifting tool into said pile sleeve and engaging the lifting tool with said pile sleeve; pulling up on said second pipe to raise said pile sleeve and thereby said structure until said structure is as near level as can be achieved; removing said lifting tool and said second pipe; repeating the above cementing and leveling operations on each of said other pile sleeves until said structure is level; and pumping cement through the second pipe into the top of each of said pile sleeves until cement fills said pile sleeves.
Claim 27
Dependent Claim
77 words
A method as recited in claim 21 including: conditioning said pile hole by displacing seawater with viscous drilling fluid to preserve said pile hole prior to the step of removing said drill string and drill bit to said vessel; and running a logging tool through said first pipe to detect cement as it moves uphole in the first pipe-pile hole annulus, said cement containing radioactive material sufficient to provide a reading on a radioactive detector logging tool.
Claim 28
Dependent Claim
38 words
A method as recited in claim 21 including the steps of: drilling out cement in each of said pile sleeves; cutting off each of said pile sleeves; deballasting said structure; and floating said structure to the water surface.
Claim 29
Dependent Claim
93 words
A method as recited in claim 23 in which said structure is rectangular and said pile sleeves are positioned at each corner of said rectangle and including the steps of: drilling out cement in two of the diagonally positioned pile sleeves and then cutting off those pile sleeves; initiating deballasting of said structure; drilling out cement in the remaining two pile sleeves; locating explosive compounds at the point of severance of said other two pile sleeves and then explosively severing said other two pile sleeves; and floating said structure to the water's surface.