Abstract

Abstract Process for automatically testing the links and components of a multistage telephone switching network for determining the continuing proper operation thereof and for indicating the presence, location and type of malfunctions which are detected.

Inventors

  • 👤 William A Oswald
  • 👤 Frank Y Shaw
  • 👤 Lloyd H Yost

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-22 22:39
CPC Classifications
H; H04; H04Q; H04Q1/00; H04Q1/18; H04Q1/20; H04Q1/22; H04Q1/24

Claims Analysis

Total Claims: 50
Claim 1
Independent Claim 278 words
Process for testing the operability of a multistage switching network wherein a calling one of a plurality of lines may be connected through one of a plurality of links to one of a plurality of outgoing trunks or through one of a plurality of junctors and another one of said plurality of links to another terminating line under control of a control network and providing a visual indication by indicating means of failures detected therein, comprising 1. storing first, second, third and fourth numerical designations representing a first link, a calling line, a terminating line and a junctor in discrete memory locations, 2. actuating the link and marking the calling line and junctor represented by said stored designations to determine if an operative originating path will be established, 3. incrementing the stored numerical designation of the link, 4. actuating the link and marking the terminating line and junctor represented by said stored designations to determine if an operative terminating path will be established, 5. releasing the originating path and after a time period check to insure that the path has released, 6. release the terminating path and after a time period check to insure that the path has released, 7. repeat steps (2) through (6) until stored link designation represents the last link of the system, 8. incrementing the stored numerical designations of calling line and terminating line and restore first link designation, 9. repeat steps (2) through (8) until stored line designations represent the last lines, 10. increment stored numerical designation of junctor and restore original link, calling line and terminating line designations, and 11. repeat steps (2) through (10) until stored junctor designation represents last junctor.
Claim 2
Dependent Claim 278 words
Process for testing the operability of a multistage switching network wherein a calling one of a plurality of lines may be connected through one of a plurality of links to one of a plurality of outgoing trunks or through one of a plurality of junctors and another one of said plurality of links to another terminating line under control of a control network and providing a visual indication by indicating means of failures detected therein, comprising 1. storing first, second, third and fourth numerical designations representing a first link, a calling line, a terminating line and a junctor in discrete memory locations, 2. actuating the link and marking the calling line and junctor represented by said stored designations to determine if an operative originating path will be established, 3. incrementing the stored numerical designation of the link, 4. actuating the link and marking the terminating line and junctor represented by said stored designations to determine if an operative terminating path will be established, 5. releasing the originating path and after a time period check to insure that the path has released, 6. release the terminating path and after a time period check to insure that the path has released, 7. repeat steps (2) through (6) until stored link designation represents the last link of the system, 8. incrementing the stored numerical designations of calling line and terminating line and restore first link designation, 9. repeat steps (2) through (8) until stored line designations represent the last lines, 10. increment stored numerical designation of junctor and restore original link, calling line and terminating line designations, and 11. repeat steps (2) through (10) until stored junctor designation represents last junctor.
Claim 3
Dependent Claim 25 words
actuating the link and marking the calling line and junctor represented by said stored designations to determine if an operative originating path will be established,
Claim 4
Dependent Claim 25 words
actuating the link and marking the calling line and junctor represented by said stored designations to determine if an operative originating path will be established,
Claim 5
Dependent Claim 76 words
Process as defined in claim 1, wherein between steps (1) and (2) there is included the steps of checking the operating condition of said control network to determine if it is busy, waiting a given time longer than the maximum operating time of said control network when it is found busy, thereafter again checking the operating condition of said control network, and if still busy actuating said indicating means to indicate failure of the control network.
Claim 6
Dependent Claim 26 words
actuating the link and marking the calling line and the trunk represented by said stored designations to determine if an operative originating path will be established,
Claim 7
Dependent Claim 26 words
actuating the link and marking the calling line and the trunk represented by said stored designations to determine if an operative originating path will be established,
Claim 8
Dependent Claim 8 words
incrementing the stored numerical designation of the link,
Claim 9
Dependent Claim 8 words
incrementing the stored numerical designation of the link,
Claim 10
Dependent Claim 50 words
Process as defined in claim 1, wherein step (2) includes after a time period, checking to determine whether an operative originating path is established, and if no operative path is established, actuating said indicating means to indicate a failure, and designate the link, junctor and calling line involved as stored.
Claim 11
Dependent Claim 8 words
incrementing the stored numerical designation of the link,
Claim 12
Dependent Claim 8 words
incrementing the stored numerical designation of the link,
Claim 13
Dependent Claim 25 words
actuating the link and marking the terminating line and junctor represented by said stored designations to determine if an operative terminating path will be established,
Claim 14
Dependent Claim 25 words
actuating the link and marking the terminating line and junctor represented by said stored designations to determine if an operative terminating path will be established,
Claim 15
Dependent Claim 50 words
Process as defined in claim 1, wherein step (4) includes after a time period, checking to determine whether an operative terminating path is established, and if no operative path is established, actuating said indicating means to indicate a failure, and designate the link, junctor and terminating line involved as stored.
Claim 16
Dependent Claim 17 words
releasing the originating path and after a time period check to insure that the path has released,
Claim 17
Dependent Claim 17 words
releasing the originating path and after a time period check to insure that the path has released,
Claim 18
Dependent Claim 14 words
repeat steps (2) through (4) until stored link designation represents last link of system,
Claim 19
Dependent Claim 14 words
repeat steps (2) through (4) until stored link designation represents last link of system,
Claim 20
Dependent Claim 35 words
Process as defined in claim 1, wherein step (5) includes actuating said indicating means to indicate a failure, and designate the link, junctor and calling line involved as stored, if no operative path is established.
Claim 21
Dependent Claim 17 words
releasing the originating path and after a time period check to insure that the path has released,
Claim 22
Dependent Claim 17 words
releasing the originating path and after a time period check to insure that the path has released,
Claim 23
Dependent Claim 17 words
release the terminating path and after a time period check to insure that the path has released,
Claim 24
Dependent Claim 17 words
release the terminating path and after a time period check to insure that the path has released,
Claim 25
Dependent Claim 35 words
Process as defined in claim 1, wherein step (6) includes actuating said indicating means to indicate a failure, and designate the link, junctor and terminating line involved as stoRed, if no operative path is established.
Claim 26
Dependent Claim 12 words
incrementing stored numerical designation of calling line and restore first link designation,
Claim 27
Dependent Claim 12 words
incrementing stored numerical designation of calling line and restore first link designation,
Claim 28
Dependent Claim 13 words
repeat steps (2) through (6) until stored calling line designation represents last line,
Claim 29
Dependent Claim 13 words
repeat steps (2) through (6) until stored calling line designation represents last line,
Claim 30
Dependent Claim 31 words
Process as defined in claim 1, wherein step (2) further includes checking the stored numerical designation of the link to determine if this link is the last link in the system.
Claim 31
Dependent Claim 16 words
repeat steps (2) through (6) until stored link designation represents the last link of the system,
Claim 32
Dependent Claim 16 words
repeat steps (2) through (6) until stored link designation represents the last link of the system,
Claim 33
Dependent Claim 16 words
incrementing the stored numerical designations of calling line and terminating line and restore first link designation,
Claim 34
Dependent Claim 16 words
incrementing the stored numerical designations of calling line and terminating line and restore first link designation,
Claim 35
Dependent Claim 31 words
Process as defined in claim 1, wherein step (4) further includes checking the stored numerical designation of the link to determine if this link is the last link in the system.
Claim 36
Dependent Claim 16 words
increment stored numerical designation of trunk and restore original first and second stored numerical designations, and
Claim 37
Dependent Claim 16 words
increment stored numerical designation of trunk and restore original first and second stored numerical designations, and
Claim 38
Dependent Claim 12 words
repeat steps (2) through (8) until stored trunk designation represents last trunk.
Claim 39
Dependent Claim 12 words
repeat steps (2) through (8) until stored trunk designation represents last trunk.
Claim 40
Dependent Claim 76 words
Process for testing the operability of a multistage switching network wherein a calling one of a plurality of lines may be connected through one of a plurality of links to one of a plurality of outgoing trunks or through one of a plurality of junctors and another one of said plurality of links to another terminating line under control of a control network and providing a visual indication by indicating means of failure detected therein, comprising
Claim 41
Dependent Claim 76 words
Process for testing the operability of a multistage switching network wherein a calling one of a plurality of lines may be connected through one of a plurality of links to one of a plurality of outgoing trunks or through one of a plurality of junctors and another one of said plurality of links to another terminating line under control of a control network and providing a visual indication by indicating means of failure detected therein, comprising
Claim 42
Dependent Claim 13 words
repeat steps (2) through (8) until stored line designations represent the last lines,
Claim 43
Dependent Claim 13 words
repeat steps (2) through (8) until stored line designations represent the last lines,
Claim 44
Dependent Claim 17 words
increment stored numerical designation of junctor and restore original link, calling line and terminating line designations, and
Claim 45
Dependent Claim 17 words
increment stored numerical designation of junctor and restore original link, calling line and terminating line designations, and
Claim 46
Dependent Claim 76 words
Process as defined in claim 9, wherein between steps (1) and (2) there is included the steps of checking the operating condition of said control network to determine if it is busy, waiting a given time longer than the maximum operating time of said control network when it is found busy, thereafter again checking the operating condition of said control network, and if still busy actuating said indicating means to indicate failure of the control network.
Claim 47
Dependent Claim 50 words
Process as defined in claim 9, wherein step (2) includes after a time period, checking to determine whether an operative originating path is established, and if no operative path is established, actuating said indicating means to indicate a failure, and designate the link, junctor and calling line involved as stored.
Claim 48
Dependent Claim 12 words
repeat steps (2) through (10) until stored junctor designation represents last junctor.
Claim 49
Dependent Claim 12 words
repeat steps (2) through (10) until stored junctor designation represents last junctor.
Claim 50
Dependent Claim 35 words
Process as defined in claim 9, wherein step (5) includes actuating said indicating means to indicate a failure, and designate the link, junctor and calling line involved as stored, if no operative path is established.

References Cited (Backward Citations)

US3064090A Cited
US3299220A Cited
US3435159A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1974-12-06 1975-06-07 1975-12-07 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1978-12-06 1979-06-07 1979-12-07 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1982-12-06 1983-06-07 1983-12-07 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags