US3377471A
Expired / Lapsed
US
⏱️ 0.0 years remaining
System effectiveness simulator and computer
Assignee: Raytheon Co
•
Filing: 1964-07-21
•
Granted: 1968-04-09
•
Expires: 1984-07-21
Abstract
No abstract record available.
Inventors
- 👤 Edward J Althaus
- 👤 Edward P Andert
- 👤 Ernest M Richter
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-22 17:58
CPC Classifications
G; G06; G06F; G06F11/00; G06F11/008; G06F30/00; G06F30/10; G06F30/15; G06F30/20; G06F2111/00; G06F2111/08
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
133 words
A DEVICE FOR SIMULATING STOCHASTIC EVENTS OF A PLURALITY OF SYSTEMS COMPRISING A PLURALITY OF ELEMENTS, EACH ELEMENT INCLUDING A FIRST AND SECOND FLIP FLOPS, EACH ELEMENT SIMULATING A DIFFERENT ONE OF THE PLURALITY OF SYSTEMS AND HAVING STATES REPRESENTATIVE OF THE OCCURRENCE OF FIRST EVENTS AND OF SECOND EVENTS, A SOURCE OF FIRST EVENT PULSES RANDOM IN TIME AND COUPLED TO SAID PLURALITY OF ELEMENTS, A SOURCE OF SECOND EVENT PULSES COUPLED TO SAID PLURALITY OF ELEMENTS, AND CONTROL MEANS COUPLED TO SAID PLURALITY OF ELEMENTS FOR CONTROLLING SAID ELEMENTS TO BE SEQUENTIALLY AND REPETITIVELY ENERGIZED TO BE RESPONSIVE TO THE OCCURRENCE OF SAID FIRST EVENT PULSES AND TO BE SEQUENTIALLY SELECTED WHEN IN SAID STATE REPRESENTATIVE OF THE OCCURRENCE OF SAID FIRST EVENT TO BE RESPONSIVE TO SAID SECOND EVENT PULSES.
Claim 2
Independent Claim
133 words
A DEVICE FOR SIMULATING STOCHASTIC EVENTS OF A PLURALITY OF SYSTEMS COMPRISING A PLURALITY OF ELEMENTS, EACH ELEMENT INCLUDING A FIRST AND SECOND FLIP FLOPS, EACH ELEMENT SIMULATING A DIFFERENT ONE OF THE PLURALITY OF SYSTEMS AND HAVING STATES REPRESENTATIVE OF THE OCCURRENCE OF FIRST EVENTS AND OF SECOND EVENTS, A SOURCE OF FIRST EVENT PULSES RANDOM IN TIME AND COUPLED TO SAID PLURALITY OF ELEMENTS, A SOURCE OF SECOND EVENT PULSES COUPLED TO SAID PLURALITY OF ELEMENTS, AND CONTROL MEANS COUPLED TO SAID PLURALITY OF ELEMENTS FOR CONTROLLING SAID ELEMENTS TO BE SEQUENTIALLY AND REPETITIVELY ENERGIZED TO BE RESPONSIVE TO THE OCCURRENCE OF SAID FIRST EVENT PULSES AND TO BE SEQUENTIALLY SELECTED WHEN IN SAID STATE REPRESENTATIVE OF THE OCCURRENCE OF SAID FIRST EVENT TO BE RESPONSIVE TO SAID SECOND EVENT PULSES.
References Cited (Backward Citations)
No citation records indexed.
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1971-04-09 | 1971-10-09 | 1972-04-09 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1975-04-09 | 1975-10-09 | 1976-04-09 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1979-04-09 | 1979-10-09 | 1980-04-09 | $7700.00 | Window Closed / Lapsed |