US3353160A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Tree priority circuit
Assignee: International Business Machines Corp
•
Filing: 1965-06-09
•
Granted: 1967-11-14
•
Expires: 1985-06-09
Abstract
No abstract record available.
Inventors
- 👤 Lindquist Arwin Bruce
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-22 18:56
CPC Classifications
G; G06; G06F; G06F13/00; G06F13/14; G06F13/36; G06F13/362; G06F13/364
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
189 words
A TREE PRIORITY CIRCUIT COMPRISING: A PLURALITY OF TREE PRIORITY CIRCUIT MODULES ARRANGED IN A TREE CONFIGURATION HAVING A PLURALITY OF LEVELS INCLUDING A FIRST LEVEL AND AT LEAST ONE ADDITIONAL LEVEL, EACH LEVEL HAVING SIGNIFICANTLY FEWER MODULES THAN THE PREVIOUS LEVEL, ALL MODULES BEING IDENTICAL, EACH SAID MODULE COMPRISING A MODULE PRIORITY GOAHEAD SIGNAL INPUT TERMINAL, A PLURALITY OF INDIVIDUALLY RANKED PRIORITY DEMAND INPUT TERMINALS AND GO-AHEAD SIGNAL OUTPUT TERMINALS; A SOURCE OF PRIORITY DEMAND SIGNALS WHICH MAY BE CHARACTERIZED AS HAVING POSITIONS IN A HIERARCHY OF RANK; MEANS CONNECTING SAID SOURCE OF PRIORITY DEMAND SIGNALS TO SAID PRIORITY DEMAND INPUT TERMINALS OF THE MODULES FORMING SIAD FIRST LEVEL; MEANS CONNECTED TO ALL OF SAID PRIORITY DEMAND SIGNAL INPUT TERMINALS FOR PROVIDING AT A MODULE PRIORITY DEMAND SIGNAL OUTPUT TERMINAL AN OUTPUT SIGNAL WHENEVER ANY ONE OF SAID PRIORITY DEMAND SIGNALS IS PRESENT; MEAND CONNECTED TO SAID PRIORITY DEMAND SIGNAL INPUT TERMINALS OF SIAD MODULE AND TO SAID MODULE PRIORITY GO-AHEAD SIGNAL TERMINAL OF SAID MODULE FOR PROVIDING AN OUTPUT AT A SELECTED ONE OF SAID GO-AHEAD SIGNAL TERMINALS RELATED TO THE HIGHEST RANKED PRIORITY DEMAND SIGNAL AVAILABLE.
Claim 2
Dependent Claim
189 words
A TREE PRIORITY CIRCUIT COMPRISING: A PLURALITY OF TREE PRIORITY CIRCUIT MODULES ARRANGED IN A TREE CONFIGURATION HAVING A PLURALITY OF LEVELS INCLUDING A FIRST LEVEL AND AT LEAST ONE ADDITIONAL LEVEL, EACH LEVEL HAVING SIGNIFICANTLY FEWER MODULES THAN THE PREVIOUS LEVEL, ALL MODULES BEING IDENTICAL, EACH SAID MODULE COMPRISING A MODULE PRIORITY GOAHEAD SIGNAL INPUT TERMINAL, A PLURALITY OF INDIVIDUALLY RANKED PRIORITY DEMAND INPUT TERMINALS AND GO-AHEAD SIGNAL OUTPUT TERMINALS; A SOURCE OF PRIORITY DEMAND SIGNALS WHICH MAY BE CHARACTERIZED AS HAVING POSITIONS IN A HIERARCHY OF RANK; MEANS CONNECTING SAID SOURCE OF PRIORITY DEMAND SIGNALS TO SAID PRIORITY DEMAND INPUT TERMINALS OF THE MODULES FORMING SIAD FIRST LEVEL; MEANS CONNECTED TO ALL OF SAID PRIORITY DEMAND SIGNAL INPUT TERMINALS FOR PROVIDING AT A MODULE PRIORITY DEMAND SIGNAL OUTPUT TERMINAL AN OUTPUT SIGNAL WHENEVER ANY ONE OF SAID PRIORITY DEMAND SIGNALS IS PRESENT; MEAND CONNECTED TO SAID PRIORITY DEMAND SIGNAL INPUT TERMINALS OF SIAD MODULE AND TO SAID MODULE PRIORITY GO-AHEAD SIGNAL TERMINAL OF SAID MODULE FOR PROVIDING AN OUTPUT AT A SELECTED ONE OF SAID GO-AHEAD SIGNAL TERMINALS RELATED TO THE HIGHEST RANKED PRIORITY DEMAND SIGNAL AVAILABLE.
References Cited (Backward Citations)
US2923475A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1970-11-13 | 1971-05-15 | 1971-11-14 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1974-11-13 | 1975-05-15 | 1975-11-14 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1978-11-13 | 1979-05-15 | 1979-11-14 | $7700.00 | Window Closed / Lapsed |