US3223761A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Melt extrusion of multi-wall plastic tubing
Assignee: Union Carbide Corp
•
Filing: 1962-04-30
•
Granted: 1965-12-14
•
Expires: 1982-04-30
Abstract
No abstract record available.
Inventors
- 👤 Garland E Raley
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-22 21:05
CPC Classifications
B; B29; B29C; B29C48/00; B29C48/25; B29C48/30; B29C48/32; B29C48/34; B29C48/03; B29C48/09; B29C48/10; B29C48/14; B29C48/147; B29C48/1472; B29C48/16; B29C48/18; B29C48/21; B29C48/335; B29C2791/00; B29C2791/004; B29C2791/007; B29C48/355
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
135 words
METHOD OF PRODUCING MULTI-WALL THERMOPLASTIC TUBING BY MELT-EXTRUSION WHICH COMPRISES, FORMING A CYLINDRICAL SOLID STREAM OF DIFFERENT MELTED THERMOPLASTIC MATERIALS IN WHICH THE THERMOPLASTIC MATERIAL TO FORM THE INNERMOST WALL OF SAID TUBING CONSTITUTES THE CORE OF SAID STREAM, AND AT LEAST ONE THERMOPLASTIC MATERIAL DIFFERENT FROM THE THERMOPLASTIC MATERIAL IN SAID CORE IS COAXIALLY DISTRIBUTED AS AN ANNULUS ENVELOPING AND CONTRACTING SAID CORE, MOVING SAID SOLID STREAM THROUGH A SYLINDERICAL PASSAGE AT A VELOCITY BELOW THE THRESHOLD OF TURBULENCE TO THEREBY MAINTAIN THE COAXIAL DISTRIBUTION OF THE MELTED THERMOPLASTIC MATERIALS, CONVERTING SAID SOLID STREAM AT THE TERMINUS OF SAID CYLINDERICAL PASSAGE INTO A TUBULAR STREAM BY AXIALLY PIERCING AND RADIALLY DISTRIBUTING THE SOLID STREAM, EXTRUDING THE TUBULAR STREAM THROUGH AN ANNULAR DIE ORFICE TO FORM TUBING AN COOLING THE TUBING TO A SET CONDITION.
Claim 2
Dependent Claim
135 words
METHOD OF PRODUCING MULTI-WALL THERMOPLASTIC TUBING BY MELT-EXTRUSION WHICH COMPRISES, FORMING A CYLINDRICAL SOLID STREAM OF DIFFERENT MELTED THERMOPLASTIC MATERIALS IN WHICH THE THERMOPLASTIC MATERIAL TO FORM THE INNERMOST WALL OF SAID TUBING CONSTITUTES THE CORE OF SAID STREAM, AND AT LEAST ONE THERMOPLASTIC MATERIAL DIFFERENT FROM THE THERMOPLASTIC MATERIAL IN SAID CORE IS COAXIALLY DISTRIBUTED AS AN ANNULUS ENVELOPING AND CONTRACTING SAID CORE, MOVING SAID SOLID STREAM THROUGH A SYLINDERICAL PASSAGE AT A VELOCITY BELOW THE THRESHOLD OF TURBULENCE TO THEREBY MAINTAIN THE COAXIAL DISTRIBUTION OF THE MELTED THERMOPLASTIC MATERIALS, CONVERTING SAID SOLID STREAM AT THE TERMINUS OF SAID CYLINDERICAL PASSAGE INTO A TUBULAR STREAM BY AXIALLY PIERCING AND RADIALLY DISTRIBUTING THE SOLID STREAM, EXTRUDING THE TUBULAR STREAM THROUGH AN ANNULAR DIE ORFICE TO FORM TUBING AN COOLING THE TUBING TO A SET CONDITION.
References Cited (Backward Citations)
US2444059A
Cited
US2461975A
Cited
US2501690A
Cited
US2750631A
Cited
FR1106628A
Cited
US2941917A
Cited
US3009208A
Cited
US2957201A
Cited
US3024494A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1968-12-13 | 1969-06-14 | 1969-12-14 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1972-12-13 | 1973-06-14 | 1973-12-14 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1976-12-13 | 1977-06-14 | 1977-12-14 | $7700.00 | Window Closed / Lapsed |