← Back to Patent Explorer
US3147380A Expired / Lapsed US ⏱️ 0.0 years remaining

Nuclear bomb explosion detecting device

Assignee: Western Union Telegraph Co
•
Filing: 1960-05-26
•
Granted: 1964-09-01
•
Expires: 1980-05-26
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 William D Buckingham
  • 👤 Frank T Turner
  • 👤 Robert H Snider

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-23 09:23
CPC Classifications
G; G01; G01T; G01T1/00; G01T1/02; G01T1/12

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 148 words
A DETECTOR COMPRISING AN ENERGY SENSITIVE MEANS A DIFFERENTIATOR MEANS FED BY SAID ENERGY SENSITIVE MEANS, A FIRST INTEGRATOR MEANS FED BY SAID ENERGY SENSITIVE MEANS, A FIRST TIMING MEANS SELECTIVELY FED BY SAID DIFFERENTIATOR MEANS TO ESTABLISH A FIRST INTERVAL OF TIME, FIRST TESTER MEANS INTERPOSED BETWEEN SAID FIRST INTEGRATOR MEANS AND SAID FIRST TIMING MEANS TO PASS A POTENTIAL THE MAGNITUDE OF WHICH IS DETERMINED BY THE POTENTIAL ON THE FIRST INTEGRATOR MEANS AT THE TERMINATION OF THE FIRST INTERVAL OF TIME, A SECOND INTEGRATOR MEANS FED BY SAID ENERGY SENSITIVE MEANS, A SECOND TIMING MEANS FED BY SAID FIRST TESTER MEANS TO ESTABLISH A SECOND INTERVAL OF TIME WHEN THE MAGNITUDE OF THE POTENTIAL PASSED BY THE FIRST TESTER MEANS IS GREATER THAN A PREDETERMINED VALUE, AND SECOND TESTER MEANS INTERPOSED BETWEEN SAID SECOND INTEGRATOR MEANS AND SAID SECOND TIMING MEANS TO PASS A POTEN-
Claim 2
Dependent Claim 148 words
A DETECTOR COMPRISING AN ENERGY SENSITIVE MEANS A DIFFERENTIATOR MEANS FED BY SAID ENERGY SENSITIVE MEANS, A FIRST INTEGRATOR MEANS FED BY SAID ENERGY SENSITIVE MEANS, A FIRST TIMING MEANS SELECTIVELY FED BY SAID DIFFERENTIATOR MEANS TO ESTABLISH A FIRST INTERVAL OF TIME, FIRST TESTER MEANS INTERPOSED BETWEEN SAID FIRST INTEGRATOR MEANS AND SAID FIRST TIMING MEANS TO PASS A POTENTIAL THE MAGNITUDE OF WHICH IS DETERMINED BY THE POTENTIAL ON THE FIRST INTEGRATOR MEANS AT THE TERMINATION OF THE FIRST INTERVAL OF TIME, A SECOND INTEGRATOR MEANS FED BY SAID ENERGY SENSITIVE MEANS, A SECOND TIMING MEANS FED BY SAID FIRST TESTER MEANS TO ESTABLISH A SECOND INTERVAL OF TIME WHEN THE MAGNITUDE OF THE POTENTIAL PASSED BY THE FIRST TESTER MEANS IS GREATER THAN A PREDETERMINED VALUE, AND SECOND TESTER MEANS INTERPOSED BETWEEN SAID SECOND INTEGRATOR MEANS AND SAID SECOND TIMING MEANS TO PASS A POTEN-

References Cited (Backward Citations)

US2700108A Cited
US2951158A Cited
US2925498A Cited
US2984746A Cited
US3078394A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1967-09-01 1968-03-02 1968-09-01 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1971-09-01 1972-03-02 1972-09-01 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1975-09-01 1976-03-02 1976-09-01 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag