← Back to Patent Explorer
US3117221A Expired / Lapsed US ⏱️ 0.0 years remaining

Electrical power computer apparatus

Assignee: General Electric Co
•
Filing: 1959-04-30
•
Granted: 1964-01-07
•
Expires: 1979-04-30
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Leon K Kirchmayer

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-22 17:20
CPC Classifications
G; G06; G06G; G06G7/00; G06G7/48; G06G7/62; G06G7/63; G06G7/635; H; H02; H02J; H02J3/00

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 300 words
APPARATUS FOR COMPUTING THE ECONOMIC DISTRIBUTION OF POWER OF A PLURALITY OF LOCAL POWER TRANSMISSION SYSTEMS INTERCONNECTED TO FORM AN INTEGRATED POWER TRANSMISSION SYSTEM, WHEREIN EACH OF SAID LOCAL SYSTEMS IS CONNECTED BY AT LEAST ONE TRANSMISSION PATH TO EXCHANGE POWER WITH AT LEAST ONE OTHER OF SAID LOCAL SYSTEMS, AND WHEREIN ONE OF SAID LOCAL SYSTEMS IS DESIGNATED AS A REFERENCE SYSTEM AND THE REMAINDER OF SAID LOCAL SYSTEMS ARE DESIGNATED AS PERIPHERAL SYSTEMS, COMPRISING; MEANS FOR PROVIDING A PLURALITY OF FIRST SIGNALS REPRESENTING RESPECTIVELY THE INCREMENTAL COST OF POWER OF A CORRESPONDING ONE OF SAID LOCAL SYSTEMS; A FIRST COMPUTING MEANS FOR EACH OF SAID PERIPHERAL SYSTEMS RESPONSIVE TO THE CORRESPONDING FIRST SIGNAL FOR COMPUTING FOR EACH OF SAID TRANSMISSION PATHS CONNECTED TO SAID CORRESPONDING PERIPHERAL SYSTEM THE INCREMENTAL COST OF TRANSMISSION LOSSES IN SAID PERIPHERAL SYSTEM FOR TRANSFER OF POWER ON SAID TRANSMISSION PATH, SAID COMPUTATION BEING BASED ON THE INCREMENTAL COST OF POWER REPRESENTED BY SAID CORRESPONDING FIRST SIGNAL, SAID FIRST COMPUTING MEANS PROVIDING A PLURALITY OF SECOND SIGNALS REPRESENTING RESPECTIVELY THE INCREMENTAL COST OF LOSSES COMPUTED THEREBY; A SECOND COMPUTING MEANS FOR EACH OF SAID PERIPHERAL SYSTEMS RESPONSIVE TO THE CORRESPONDING FIRST SIGNAL AND TO THE CORRESPONDING PLURALITY OF SECOND SIGNALS FOR COMPUTING THE CORRESPONDING INCREMENTAL COST OF POWER AT A CORRESPONDING PREDETERMINED LOCATION IN SAID INTEGRATED SYSTEM FOR A TRANSFER OF POWER BETWEEN THE CORRESPONDING PERIPHERAL SYSTEM AND SAID REFERENCE SYSTEM, SAID SECOND COMPUTING MEANS PROVIDING A THIRD SIGNAL REPRESENTING THE INCREMENTAL COST OF POWER COMPUTED THEREBY; A THIRD COMPUTING MEANS RESPONSIVE TO THE ONE OF SAID FIRST SIGNALS REPRESENTING THE INCREMENTAL COST OF POWER OF SAID REFERENCE SYSTEM FOR COMPUTING FOR EACH OF SAID TRANSMISSION PATHS CONNECTED TO SAID REFERENCE SYSTEM THE INCREMENTAL COST OF TRANSMISSION LOSSES IN SAID REFERENCE SYSTEM FOR TRANS-
Claim 2
Dependent Claim 300 words
APPARATUS FOR COMPUTING THE ECONOMIC DISTRIBUTION OF POWER OF A PLURALITY OF LOCAL POWER TRANSMISSION SYSTEMS INTERCONNECTED TO FORM AN INTEGRATED POWER TRANSMISSION SYSTEM, WHEREIN EACH OF SAID LOCAL SYSTEMS IS CONNECTED BY AT LEAST ONE TRANSMISSION PATH TO EXCHANGE POWER WITH AT LEAST ONE OTHER OF SAID LOCAL SYSTEMS, AND WHEREIN ONE OF SAID LOCAL SYSTEMS IS DESIGNATED AS A REFERENCE SYSTEM AND THE REMAINDER OF SAID LOCAL SYSTEMS ARE DESIGNATED AS PERIPHERAL SYSTEMS, COMPRISING; MEANS FOR PROVIDING A PLURALITY OF FIRST SIGNALS REPRESENTING RESPECTIVELY THE INCREMENTAL COST OF POWER OF A CORRESPONDING ONE OF SAID LOCAL SYSTEMS; A FIRST COMPUTING MEANS FOR EACH OF SAID PERIPHERAL SYSTEMS RESPONSIVE TO THE CORRESPONDING FIRST SIGNAL FOR COMPUTING FOR EACH OF SAID TRANSMISSION PATHS CONNECTED TO SAID CORRESPONDING PERIPHERAL SYSTEM THE INCREMENTAL COST OF TRANSMISSION LOSSES IN SAID PERIPHERAL SYSTEM FOR TRANSFER OF POWER ON SAID TRANSMISSION PATH, SAID COMPUTATION BEING BASED ON THE INCREMENTAL COST OF POWER REPRESENTED BY SAID CORRESPONDING FIRST SIGNAL, SAID FIRST COMPUTING MEANS PROVIDING A PLURALITY OF SECOND SIGNALS REPRESENTING RESPECTIVELY THE INCREMENTAL COST OF LOSSES COMPUTED THEREBY; A SECOND COMPUTING MEANS FOR EACH OF SAID PERIPHERAL SYSTEMS RESPONSIVE TO THE CORRESPONDING FIRST SIGNAL AND TO THE CORRESPONDING PLURALITY OF SECOND SIGNALS FOR COMPUTING THE CORRESPONDING INCREMENTAL COST OF POWER AT A CORRESPONDING PREDETERMINED LOCATION IN SAID INTEGRATED SYSTEM FOR A TRANSFER OF POWER BETWEEN THE CORRESPONDING PERIPHERAL SYSTEM AND SAID REFERENCE SYSTEM, SAID SECOND COMPUTING MEANS PROVIDING A THIRD SIGNAL REPRESENTING THE INCREMENTAL COST OF POWER COMPUTED THEREBY; A THIRD COMPUTING MEANS RESPONSIVE TO THE ONE OF SAID FIRST SIGNALS REPRESENTING THE INCREMENTAL COST OF POWER OF SAID REFERENCE SYSTEM FOR COMPUTING FOR EACH OF SAID TRANSMISSION PATHS CONNECTED TO SAID REFERENCE SYSTEM THE INCREMENTAL COST OF TRANSMISSION LOSSES IN SAID REFERENCE SYSTEM FOR TRANS-

References Cited (Backward Citations)

US2793335A Cited
US2854191A Cited
US2897476A Cited
US2861197A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1967-01-06 1967-07-08 1968-01-07 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1971-01-06 1971-07-08 1972-01-07 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1975-01-06 1975-07-08 1976-01-07 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag