← Back to Patent Explorer
US3097940A Expired / Lapsed US ⏱️ 0.0 years remaining

Process for purifying gases

Assignee: Union Carbide Corp
•
Filing: 1961-03-01
•
Granted: 1963-07-16
•
Expires: 1981-03-01
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Houston Reagan

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-23 19:59
CPC Classifications
F; F25; F25J; F25J3/00; F25J3/08

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 304 words
A PROCESS FOR COOLING AND CLEANING AN IMPURITY-CONTAINING GAS COMPRISING THE STEPS OF PROVIDING A FIRST HEAT EXCHANGE ZONE HAVING FIRST AND SECOND THERMALLY ASSOCIATED PASSAGEWAYS AND A SECOND HEAT EXCHANGE ZONE HAVING THIRD AND FOURTH THERMALLY ASSOCIATED PASSAGEWAYS; PROVIDING AN IMPURITY-CONTAINING FEED GAS AT THE LOWER END OF SAID FIRST PASSAGEWAY FOR UPWARD FLOW THERETHROUGH TO THE TOP END OF SUCH PASSAGEWAY; PROVIDING A FIRST REFRIGERANT FLUID FOR FLOW THROUGH SAID SECOND PASSAGEWAY; COOLING SAID IMPURITY-CONTAINING FEED GAS BY HEAT EXCHANGE WITH SAID FIRST REFRIGERANT DURING SAID UPWARD FLOW TO A TEMPERATURE BETWEEN THE LIQUEFACTION AND SNOW POINTS OF SAID IMPURITY THEREBY CONDENSING THE IMPURITY AS A LIQUID ON THE WALLS OF SAID FIRST PASSAGEWAY; DRAINING THE CONDENSED IMPURITY FROM THE PASSAGEWAY LOWER END; DISCHARGING THE IMPURITY-DEPLETED FEED GAS FROM SAID TOP END OF SAID FIRST PASSAGEWAY AND DIRECTING THE GAS TO THE LOWER END OF SAID THIRD PASSAGEWAY FOR UPWARD FLOW THERETHROUGH TO THE TOP END OF SUCH PASSAGEWAY; PROVIDING A SECOND REFRIGERANT FLUID FOR FLOW THROUGH SAID FOURTH PASSAGEWAY IN SAID SECOND HEAT EXCHANGE ZONE; FURTHER COOLING SAID IMPURITY-DEPLETED FEED GAS BY HEAT EXCHANGE WITH SAID SECOND REFRIGERANT DURING SAID UPWARD FLOW TO A TEMPERATURE BELOW THE SNOW POINT OF SAID IMPURITY THEREBY DEPOSITING THE FROZEN IMPURITY ON THE WALLS OF SAID THIRD PASSAGEWAY; DISCHARGING AN IMPURITY-FURTHER DEPLETED PRODUCT GAS FROM THE TOP END OF SAID THIRD PASSAGEWAY; TERMINATING THE FLOW OF SAID IMPURITY-DEPLETED FEED GAS TO SID THIRD PASSAGEWAY AND THE FLOW OF SAID SECOND REFRIGERANT TO SAID FOURTH PASSAGEWAY; WARMING SAID THIRD PASSAGEWAY SUFFICIENTLY TO MELT SAID FROZEN IMPURITY; DRAINING THE MELTED IMPURITY FROM THE THIRD PASSAGEWAY LOWER END AND FLOWING SUCH LIQUID IMPURITY IN HEAT EXCHANGE RELATION WITH SAID IMPURITY-CONTAINING FEED GAS IN SAID FIRST PASSAGEWAY THEREBY EFFECTING COOLING OF SUCH FEED GAS AND EVAPORATION OF THE IMPURITY.
Claim 2
Dependent Claim 304 words
A PROCESS FOR COOLING AND CLEANING AN IMPURITY-CONTAINING GAS COMPRISING THE STEPS OF PROVIDING A FIRST HEAT EXCHANGE ZONE HAVING FIRST AND SECOND THERMALLY ASSOCIATED PASSAGEWAYS AND A SECOND HEAT EXCHANGE ZONE HAVING THIRD AND FOURTH THERMALLY ASSOCIATED PASSAGEWAYS; PROVIDING AN IMPURITY-CONTAINING FEED GAS AT THE LOWER END OF SAID FIRST PASSAGEWAY FOR UPWARD FLOW THERETHROUGH TO THE TOP END OF SUCH PASSAGEWAY; PROVIDING A FIRST REFRIGERANT FLUID FOR FLOW THROUGH SAID SECOND PASSAGEWAY; COOLING SAID IMPURITY-CONTAINING FEED GAS BY HEAT EXCHANGE WITH SAID FIRST REFRIGERANT DURING SAID UPWARD FLOW TO A TEMPERATURE BETWEEN THE LIQUEFACTION AND SNOW POINTS OF SAID IMPURITY THEREBY CONDENSING THE IMPURITY AS A LIQUID ON THE WALLS OF SAID FIRST PASSAGEWAY; DRAINING THE CONDENSED IMPURITY FROM THE PASSAGEWAY LOWER END; DISCHARGING THE IMPURITY-DEPLETED FEED GAS FROM SAID TOP END OF SAID FIRST PASSAGEWAY AND DIRECTING THE GAS TO THE LOWER END OF SAID THIRD PASSAGEWAY FOR UPWARD FLOW THERETHROUGH TO THE TOP END OF SUCH PASSAGEWAY; PROVIDING A SECOND REFRIGERANT FLUID FOR FLOW THROUGH SAID FOURTH PASSAGEWAY IN SAID SECOND HEAT EXCHANGE ZONE; FURTHER COOLING SAID IMPURITY-DEPLETED FEED GAS BY HEAT EXCHANGE WITH SAID SECOND REFRIGERANT DURING SAID UPWARD FLOW TO A TEMPERATURE BELOW THE SNOW POINT OF SAID IMPURITY THEREBY DEPOSITING THE FROZEN IMPURITY ON THE WALLS OF SAID THIRD PASSAGEWAY; DISCHARGING AN IMPURITY-FURTHER DEPLETED PRODUCT GAS FROM THE TOP END OF SAID THIRD PASSAGEWAY; TERMINATING THE FLOW OF SAID IMPURITY-DEPLETED FEED GAS TO SID THIRD PASSAGEWAY AND THE FLOW OF SAID SECOND REFRIGERANT TO SAID FOURTH PASSAGEWAY; WARMING SAID THIRD PASSAGEWAY SUFFICIENTLY TO MELT SAID FROZEN IMPURITY; DRAINING THE MELTED IMPURITY FROM THE THIRD PASSAGEWAY LOWER END AND FLOWING SUCH LIQUID IMPURITY IN HEAT EXCHANGE RELATION WITH SAID IMPURITY-CONTAINING FEED GAS IN SAID FIRST PASSAGEWAY THEREBY EFFECTING COOLING OF SUCH FEED GAS AND EVAPORATION OF THE IMPURITY.

References Cited (Backward Citations)

US1723425A Cited
US1830610A Cited
GB275633A Cited
DE511567C Cited
US1842263A Cited
US2022782A Cited
DE685490C Cited
US2252739A Cited
US2849867A Cited
US2960835A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1966-07-15 1967-01-14 1967-07-16 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1970-07-15 1971-01-14 1971-07-16 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1974-07-15 1975-01-14 1975-07-16 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag