← Back to Patent Explorer
US3070988A Expired / Lapsed US ⏱️ 0.0 years remaining

Oxygen analyzer-standardizer

Assignee: Standard Oil Co
•
Filing: 1957-10-15
•
Granted: 1963-01-01
•
Expires: 1977-10-15
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Kapff Sixt Frederick
  • 👤 Giurato Dominic Daniel Lo

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-23 13:00
CPC Classifications
G; G01; G01N; G01N33/00; G01N33/0004; G01N33/0006; G01N27/00; G01N27/72; G01N27/74

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 162 words
IN AN APPARATUS FOR CONTINUOUSLY MONITORING A PROCESS GAS SAMPLE, INCLUDING AN ANALYZER, A FIRST VALVED CONDUIT MEANS FOR DELIVERING A PROCESS GAS SAMPLE TO SAID ANALYZER, A SOURCE OF CALIBRATION GAS OF KNOWN COMPOSITION, A SECOND VALVED CONDUIT MEANS FOR DERLIVERING A CALIBRATION GAS SAMPLE TO SAID ANALYZER, THE IMPROVEMENT WHEREBY SAID ANALYZER MAY BE STANDARDIZED BOTH AUTOMATICALLY AND MANUALLY WHILE IN SERVICE COMPRISING: A SHORT PERIOD CYCLE TIMER CONTROLLING BOTH OF SAID VALVED CONDUIT MEANS TO INTERRUPT PROCESS GAS SAMPLE FLOW THROUGH SAID FIRST VALVED CONDUIT MEANS AND TO PERMIT CALIBRATION GAS FLOW THROUGH SAID SECOND VALVED CONDUIT MEANS FOR A CONTROLLED PERIOD OF TIME TO EFFECT STANDARDIZATION OF SAID ANALYZER AND THEREAFTER RETURN THE RESPECTIVE FLOWS TO THEIR ORIGINAL CONDITION, A LONG PERIOD CYCLE TIMER CONTROLLING SAID SHORT PERIOD CYCLE TIMER AND THEREBY DETERMINING THE CYCLE OVER WHICH SAID SHORT PERIOD CYCLE TIMER OPERATES, AND MANUAL SWITCH MEANS INDEPENDENTLY CONTROLLING SAID SHORT PERIOD CYCLE TIMER TO EFFECT MANUAL STANDARDIZATION.
Claim 2
Dependent Claim 162 words
IN AN APPARATUS FOR CONTINUOUSLY MONITORING A PROCESS GAS SAMPLE, INCLUDING AN ANALYZER, A FIRST VALVED CONDUIT MEANS FOR DELIVERING A PROCESS GAS SAMPLE TO SAID ANALYZER, A SOURCE OF CALIBRATION GAS OF KNOWN COMPOSITION, A SECOND VALVED CONDUIT MEANS FOR DERLIVERING A CALIBRATION GAS SAMPLE TO SAID ANALYZER, THE IMPROVEMENT WHEREBY SAID ANALYZER MAY BE STANDARDIZED BOTH AUTOMATICALLY AND MANUALLY WHILE IN SERVICE COMPRISING: A SHORT PERIOD CYCLE TIMER CONTROLLING BOTH OF SAID VALVED CONDUIT MEANS TO INTERRUPT PROCESS GAS SAMPLE FLOW THROUGH SAID FIRST VALVED CONDUIT MEANS AND TO PERMIT CALIBRATION GAS FLOW THROUGH SAID SECOND VALVED CONDUIT MEANS FOR A CONTROLLED PERIOD OF TIME TO EFFECT STANDARDIZATION OF SAID ANALYZER AND THEREAFTER RETURN THE RESPECTIVE FLOWS TO THEIR ORIGINAL CONDITION, A LONG PERIOD CYCLE TIMER CONTROLLING SAID SHORT PERIOD CYCLE TIMER AND THEREBY DETERMINING THE CYCLE OVER WHICH SAID SHORT PERIOD CYCLE TIMER OPERATES, AND MANUAL SWITCH MEANS INDEPENDENTLY CONTROLLING SAID SHORT PERIOD CYCLE TIMER TO EFFECT MANUAL STANDARDIZATION.

References Cited (Backward Citations)

US2637019A Cited
US1933322A Cited
US2211627A Cited
US2618150A Cited
US2663379A Cited
US2721578A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1965-12-31 1966-07-02 1967-01-01 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1969-12-31 1970-07-02 1971-01-01 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1973-12-31 1974-07-02 1975-01-01 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag